After physical link is created logical link needs to be created.
The process starts after L2CAP channel is created and L2CAP
Configuration Response with result PENDING is received.
Signed-off-by: Andrei Emeltchenko <andrei.emeltchenko@intel.com>
Acked-by: Marcel Holtmann <marcel@holtmann.org>
Signed-off-by: Gustavo Padovan <gustavo.padovan@collabora.co.uk>
When logical link creation is completed we need to save hs_hchan
which represents logical link instead of hs_hcon representing
physical link. hs_hcon shall be saved when receiving physical link
complete event.
Signed-off-by: Andrei Emeltchenko <andrei.emeltchenko@intel.com>
Acked-by: Marcel Holtmann <marcel@holtmann.org>
Signed-off-by: Gustavo Padovan <gustavo.padovan@collabora.co.uk>
__constant_cpu_to_le*() is the right go here.
Signed-off-by: Syam Sidhardhan <s.syam@samsung.com>
Acked-by: Marcel Holtmann <marcel@holtmann.org>
Signed-off-by: Gustavo Padovan <gustavo.padovan@collabora.co.uk>
For files only using THIS_MODULE and/or EXPORT_SYMBOL, map
them onto including export.h -- or if the file isn't even
using those, then just delete the include.
Signed-off-by: Syam Sidhardhan <s.syam@samsung.com>
Signed-off-by: Gustavo Padovan <gustavo.padovan@collabora.co.uk>
When refcnt reaches zero disconnect timeout will run and hci_conn
will be disconnected.
Signed-off-by: Andrei Emeltchenko <andrei.emeltchenko@intel.com>
Acked-by: Marcel Holtmann <marcel@holtmann.org>
Signed-off-by: Gustavo Padovan <gustavo.padovan@collabora.co.uk>
Add processing for HCI Physical Link Complete event. Upon
successful status received start L2CAP create channel process.
Signed-off-by: Andrei Emeltchenko <andrei.emeltchenko@intel.com>
Acked-by: Marcel Holtmann <marcel@holtmann.org>
Signed-off-by: Gustavo Padovan <gustavo.padovan@collabora.co.uk>
There is helper function used to send EFS Configuration Response.
Signed-off-by: Andrei Emeltchenko <andrei.emeltchenko@intel.com>
Acked-by: Marcel Holtmann <marcel@holtmann.org>
Signed-off-by: Gustavo Padovan <gustavo.padovan@collabora.co.uk>
Assignment is not needed here since err is always gets value.
Signed-off-by: Andrei Emeltchenko <andrei.emeltchenko@intel.com>
Acked-by: Marcel Holtmann <marcel@holtmann.org>
Signed-off-by: Gustavo Padovan <gustavo.padovan@collabora.co.uk>
This patch fixes sending an unnecessary HCI_LE_Host_Enable command if
the command has already been sent as part of the default HCI init
sequence.
Signed-off-by: Johan Hedberg <johan.hedberg@intel.com>
Signed-off-by: Gustavo Padovan <gustavo.padovan@collabora.co.uk>
When powered on the EIR data gets updated as the last step by mgmt.
Therefore avoid an update when getting a local name update as that's
part of the normal HCI init sequence.
Signed-off-by: Johan Hedberg <johan.hedberg@intel.com>
Acked-by: Marcel Holtmann <marcel@holtmann.org>
Signed-off-by: Gustavo Padovan <gustavo.padovan@collabora.co.uk>
This patch fixes sending an unnecessary HCI_Write_SSP_Mode command if
the command has already been sent as part of the default HCI init
sequence.
Signed-off-by: Johan Hedberg <johan.hedberg@intel.com>
Acked-by: Marcel Holtmann <marcel@holtmann.org>
Signed-off-by: Gustavo Padovan <gustavo.padovan@collabora.co.uk>
When we get a successful command complete for HCI_Write_SSP_Mode we need
to update the host feature bits for the hdev struct accordingly.
Signed-off-by: Johan Hedberg <johan.hedberg@intel.com>
Acked-by: Marcel Holtmann <marcel@holtmann.org>
Signed-off-by: Gustavo Padovan <gustavo.padovan@collabora.co.uk>
When an adapter is in the LE peripheral role scanning for other devices
or initiating connections to them is not allowed. This patch makes sure
that such attempts will result in appropriate error returns.
Signed-off-by: Johan Hedberg <johan.hedberg@intel.com>
Acked-by: Marcel Holtmann <marcel@holtmann.org>
Signed-off-by: Gustavo Padovan <gustavo.padovan@collabora.co.uk>
For better code readability and avoiding simple bugs of checking the
wrong byte of the features make use of feature test macros whenever
possible.
Signed-off-by: Johan Hedberg <johan.hedberg@intel.com>
Acked-by: Marcel Holtmann <marcel@holtmann.org>
Signed-off-by: Gustavo Padovan <gustavo.padovan@collabora.co.uk>
When LE has been enabled with the simultaneous BR/EDR & LE parameter set
to true we should also update the host features stored in struct hci_dev
accordingly.
Signed-off-by: Johan Hedberg <johan.hedberg@intel.com>
Acked-by: Marcel Holtmann <marcel@holtmann.org>
Signed-off-by: Gustavo Padovan <gustavo.padovan@collabora.co.uk>
This patch makes sure that settings which are specific for BR/EDR
capable adapters are not allowed for non-BR/EDR (e.g. LE-only) adapters.
Instead, a "not supported" error is returned of such a setting is
attempted to be set for a non-BR/EDR adapter.
Signed-off-by: Johan Hedberg <johan.hedberg@intel.com>
Acked-by: Marcel Holtmann <marcel@holtmann.org>
Signed-off-by: Gustavo Padovan <gustavo.padovan@collabora.co.uk>
This patch makes sure that we don't send BR/EDR-only commands for
LE-only adapters when they get powered on. Doing this would just cause
command errors.
Signed-off-by: Johan Hedberg <johan.hedberg@intel.com>
Acked-by: Marcel Holtmann <marcel@holtmann.org>
Signed-off-by: Gustavo Padovan <gustavo.padovan@collabora.co.uk>
le_init() and bredr_init() are now called le_setup() and bredr_setup() to
avoid duplicates names over the tree even if they are all static.
Signed-off-by: Gustavo Padovan <gustavo.padovan@collabora.co.uk>
This patch adds the reading of the LE advertising channel TX power to
the HCI init sequence of LE-capable controllers. This data will be used
e.g. for inclusion in the advertising data packets when advertising is
enabled.
Signed-off-by: Johan Hedberg <johan.hedberg@intel.com>
Acked-by: Marcel Holtmann <marcel@holtmann.org>
Signed-off-by: Gustavo Padovan <gustavo.padovan@collabora.co.uk>
This patch adds setting of the LE event mask to the HCI init procedure
for LE-capable controllers. Right now we only set the default mask which
is good enough for the events available in the 4.0 core specification.
Signed-off-by: Johan Hedberg <johan.hedberg@intel.com>
Acked-by: Marcel Holtmann <marcel@holtmann.org>
Signed-off-by: Gustavo Padovan <gustavo.padovan@collabora.co.uk>
This patch fixes the use of le_mtu and le_pkts values in the
HCIGETDEVINFO ioctl for LE-only controllers.
Signed-off-by: Johan Hedberg <johan.hedberg@intel.com>
Acked-by: Marcel Holtmann <marcel@holtmann.org>
Signed-off-by: Gustavo Padovan <gustavo.padovan@collabora.co.uk>
This patch splits off most the HCI init sequence commands from a fixed
set into a conditional one that is sent once the HCI_Read_Local_Features
and HCI_Read_Local_Version_Information commands complete. This is
necessary since many of the current fixed commands are not allowed for
LE-only controllers.
Signed-off-by: Johan Hedberg <johan.hedberg@intel.com>
Acked-by: Marcel Holtmann <marcel@holtmann.org>
Signed-off-by: Gustavo Padovan <gustavo.padovan@collabora.co.uk>
include <linux/export.h> is the right to go here.
Signed-off-by: Syam Sidhardhan <s.syam@samsung.com>
Acked-by: Marcel Holtmann <marcel@holtmann.org>
Signed-off-by: Gustavo Padovan <gustavo.padovan@collabora.co.uk>
Channel moves are triggered by changes to the BT_CHANNEL_POLICY
sockopt when an ERTM or streaming-mode channel is connected.
Moves are only started if enable_hs is true.
Signed-off-by: Mat Martineau <mathewm@codeaurora.org>
Acked-by: Marcel Holtmann <marcel@holtmann.org>
Signed-off-by: Gustavo Padovan <gustavo.padovan@collabora.co.uk>
Do not retransmit previously-sent data when a "receiver ready" s-frame
with the "final" flag is received during a move.
The ERTM state machines will resynchronize at the end of a channel
move, and the state machine needs to avoid state changes during a
move.
Signed-off-by: Mat Martineau <mathewm@codeaurora.org>
Acked-by: Marcel Holtmann <marcel@holtmann.org>
Acked-by: Andrei Emeltchenko <andrei.emeltchenko@intel.com>
Signed-off-by: Gustavo Padovan <gustavo.padovan@collabora.co.uk>
When operating over BR/EDR, ERTM accounts for the maximum over-the-air
packet size when setting the PDU size. AMP controllers do not use the
same over-the-air packets, so the PDU size should only be based on the
HCI MTU of the AMP controller.
Signed-off-by: Mat Martineau <mathewm@codeaurora.org>
Signed-off-by: Andrei Emeltchenko <andrei.emeltchenko@intel.com>
Acked-by: Marcel Holtmann <marcel@holtmann.org>
Signed-off-by: Gustavo Padovan <gustavo.padovan@collabora.co.uk>
The L2CAP spec recommends specific retransmit and monitor timeouts for
ERTM channels that are on AMP controllers. These timeouts are
calculated from the AMP controller's best effort flush timeout.
BR/EDR controllers use the default retransmit and monitor timeouts.
Signed-off-by: Mat Martineau <mathewm@codeaurora.org>
Acked-by: Marcel Holtmann <marcel@holtmann.org>
Signed-off-by: Gustavo Padovan <gustavo.padovan@collabora.co.uk>
Outgoing ERTM data is queued during a channel move. The ERTM state
machine is partially reset at the start of a move, and must be
resynchronized with the remote state machine at the end of the move.
Data is not sent so that there are no state transitions between the
partial reset and the resync.
Streaming mode frames are dropped during a move.
Signed-off-by: Mat Martineau <mathewm@codeaurora.org>
Acked-by: Marcel Holtmann <marcel@holtmann.org>
Acked-by: Andrei Emeltchenko <andrei.emeltchenko@intel.com>
Signed-off-by: Gustavo Padovan <gustavo.padovan@collabora.co.uk>
AMP controllers expect to transmit only "complete" ACL frames. These
frames have both the "start" and "cont" bits set. AMP does not allow
fragmented ACLs.
Signed-off-by: Mat Martineau <mathewm@codeaurora.org>
Acked-by: Marcel Holtmann <marcel@holtmann.org>
Acked-by: Andrei Emeltchenko <andrei.emeltchenko@intel.com>
Signed-off-by: Gustavo Padovan <gustavo.padovan@collabora.co.uk>
Several different actions may be taken when an AMP physical link
becomes available. A channel being created on an AMP controller must
continue the connection process. A channel being moved needs to
either send a move request or a move response. A failed physical link
will revert to using a BR/EDR controller if possible.
Signed-off-by: Mat Martineau <mathewm@codeaurora.org>
Acked-by: Marcel Holtmann <marcel@holtmann.org>
Acked-by: Andrei Emeltchenko <andrei.emeltchenko@intel.com>
Signed-off-by: Gustavo Padovan <gustavo.padovan@collabora.co.uk>
The move confirm response concludes the channel move command sequence.
Receipt of this command indicates that data may begin to flow again.
Signed-off-by: Mat Martineau <mathewm@codeaurora.org>
Acked-by: Marcel Holtmann <marcel@holtmann.org>
Acked-by: Andrei Emeltchenko <andrei.emeltchenko@intel.com>
Signed-off-by: Gustavo Padovan <gustavo.padovan@collabora.co.uk>
The logical link confirm callback is executed when the AMP controller
completes its logical link setup. During a channel move, a newly
formed logical link allows a move responder to send a move channel
response. A move initiator will send a move channel confirm. A
failed logical link will end the channel move and send an appropriate
response or confirm command indicating a failure.
If the channel is being created on an AMP controller, L2CAP
configuration is completed after the logical link is set up.
Signed-off-by: Mat Martineau <mathewm@codeaurora.org>
Acked-by: Marcel Holtmann <marcel@holtmann.org>
Signed-off-by: Gustavo Padovan <gustavo.padovan@collabora.co.uk>
The move response command includes a result code indicating
"pending", "success", or "failure" status. A pending result is
received when the remote address is still setting up a physical link,
and will be followed by success or failure. On success, logical link
setup will proceed. On failure, the move is stopped. The receiver of
a move channel response must always follow up by sending a move
channel confirm command.
Signed-off-by: Mat Martineau <mathewm@codeaurora.org>
Acked-by: Marcel Holtmann <marcel@holtmann.org>
Signed-off-by: Gustavo Padovan <gustavo.padovan@collabora.co.uk>
On an AMP controller, hci_chan maps to a logical link. When a channel
is being moved, the logical link may or may not be connected already.
The hci_chan->state is used to determine the existance of a useable
logical link so the link can be either used or requested.
Signed-off-by: Mat Martineau <mathewm@codeaurora.org>
Acked-by: Marcel Holtmann <marcel@holtmann.org>
Acked-by: Andrei Emeltchenko <andrei.emeltchenko@intel.com>
Signed-off-by: Gustavo Padovan <gustavo.padovan@collabora.co.uk>
After sending a move channel response, a move responder waits for a
move channel confirm command. If the received command has a
"confirmed" result the move is proceeding, and "unconfirmed" means the
move has failed and the channel will not change controllers.
Signed-off-by: Mat Martineau <mathewm@codeaurora.org>
Acked-by: Andrei Emeltchenko <andrei.emeltchenko@intel.com>
Acked-by: Marcel Holtmann <marcel@holtmann.org>
Signed-off-by: Gustavo Padovan <gustavo.padovan@collabora.co.uk>
Two new states are required to implement channel moves with the ERTM
receive state machine.
The "WAIT_P" state is used by a move responder to wait for a "poll"
flag after a move is completed (success or failure). "WAIT_F" is
similarly used by a move initiator to wait for a "final" flag when the
move is completing. In either state, the reqseq value in the
poll/final frame tells the state machine exactly which frame should be
expected next.
Signed-off-by: Mat Martineau <mathewm@codeaurora.org>
Acked-by: Marcel Holtmann <marcel@holtmann.org>
Acked-by: Andrei Emeltchenko <andrei.emeltchenko@intel.com>
Signed-off-by: Gustavo Padovan <gustavo.padovan@collabora.co.uk>
On receipt of a channel move request, the request must be validated
based on the L2CAP mode, connection state, and controller
capabilities. ERTM channels must have their state machines cleared
and transmission paused while the channel move takes place.
If the channel is being moved to an AMP controller then
an AMP physical link must be prepared. Moving the channel back to
BR/EDR proceeds immediately.
Signed-off-by: Mat Martineau <mathewm@codeaurora.org>
Acked-by: Marcel Holtmann <marcel@holtmann.org>
Acked-by: Andrei Emeltchenko <andrei.emeltchenko@intel.com>
Signed-off-by: Gustavo Padovan <gustavo.padovan@collabora.co.uk>
Processing a move channel request involves getting the channel
structure using the destination channel ID. Previous code could only
look up using the source channel ID.
Signed-off-by: Mat Martineau <mathewm@codeaurora.org>
Acked-by: Marcel Holtmann <marcel@holtmann.org>
Acked-by: Andrei Emeltchenko <andrei.emeltchenko@intel.com>
Signed-off-by: Gustavo Padovan <gustavo.padovan@collabora.co.uk>
Resolves a conflict resolution issue in "Bluetooth: Fix L2CAP coding
style". The remaining connect and create channel response handler is
renamed to better reflect its use for both response types.
Signed-off-by: Mat Martineau <mathewm@codeaurora.org>
Acked-by: Marcel Holtmann <marcel@holtmann.org>
Acked-by: Andrei Emeltchenko <andrei.emeltchenko@intel.com>
Signed-off-by: Gustavo Padovan <gustavo.padovan@collabora.co.uk>
The L2CAP create channel request is very similar to an L2CAP connect
request, but it has an additional parameter for the controller ID. If
the controller id is 0, the channel is set up on the BR/EDR controller
(just like a connect request). Using a valid high speed controller ID
will cause the channel to be initially created on that high speed
controller. While the L2CAP data will be initially routed over the
AMP controller, the L2CAP fixed signaling channel only uses BR/EDR.
When a create channel request is received for a high speed controller,
a pending response is always sent first. After the high speed
physical and logical links are complete a success response will be
sent.
Signed-off-by: Mat Martineau <mathewm@codeaurora.org>
Signed-off-by: Andrei Emeltchenko <andrei.emeltchenko@intel.com>
Acked-by: Marcel Holtmann <marcel@holtmann.org>
Signed-off-by: Gustavo Padovan <gustavo.padovan@collabora.co.uk>
An L2CAP channel using high speed continues to be associated with a
BR/EDR l2cap_conn, while also tracking an additional hci_conn
(representing a physical link on a high speed controller) and hci_chan
(representing a logical link). There may only be one physical link
between two high speed controllers. Each physical link may contain
several logical links, with each logical link representing a channel
with specific quality of service.
During a channel move, the destination channel id, current move state,
and role (initiator vs. responder) are tracked and used by the channel
move state machine. The ident value associated with a move request
must also be stored in order to use it in later move responses.
The active channel is stored in local_amp_id.
Signed-off-by: Mat Martineau <mathewm@codeaurora.org>
Signed-off-by: Andrei Emeltchenko <andrei.emeltchenko@intel.com>
Acked-by: Marcel Holtmann <marcel@holtmann.org>
Signed-off-by: Gustavo Padovan <gustavo.padovan@collabora.co.uk>
This patch prepares mac80211 for a later implementation of mesh or
ad-hoc powersave clients.
The structures related to powersave (buffer, TIM map, counters) are
moved from the AP-specific interface structure to a generic structure
that can be embedded into any interface type.
The functions related to powersave are prepared to allow easy
extension with different interface types. For example with:
+ } else if (sta->sdata->vif.type == NL80211_IFTYPE_MESH_POINT) {
+ ps = &sdata->u.mesh.ps;
Some references to the AP's beacon structure are removed where they
were obviously not used.
The patch compiles without warning and has been briefly tested as AP
interface with one client in PS mode.
Signed-off-by: Marco Porsch <marco.porsch@etit.tu-chemnitz.de>
Signed-off-by: Johannes Berg <johannes.berg@intel.com>